Property details: 3 Bedrooms three storey (two flats on each floor)
and penthouse on the top floor 106 m square Cavity walling
(10 hole horizontal brick construction) and damp proof course. Construction
concrete. Fitted kitchen units with Formica work tops – choice
of colors. Fitted wardrobes in all bedrooms. Minimum
of 2-4 electrical sockets in every room. Split type Air Conditioning
units in every room. Kitchen fitted with hob, built in oven,
dishwasher, washing machine, and fridge freezer. White PVC
or white aluminum double glazed windows. Solar panels and
hot water emersion tank system. 1 parking place per flat,
2 parking place spaces for Penthouse. Parking area concrete
tiles. Entrance door aluminum and automatic. Intercom
system for all flats. Kitchen Electrical
points. Telephone point. Double stainless
steel sinks with mixer tap. Ceramic Floor Tiles. (Vitra) Ceramic
wall tiling between base units and cupboards. Ceiling lighting.
Hob and built in oven. Extractor. Dishwasher.
Washing machine. Fridge Freezer. Kitchen
terrace mosaic floors. Lounge Electrical
points. Telephone point. TV point. Ceiling
and/or wall lights. A/C 24000 BTU heating and cooling. Ceramic
Floor Tiles. (Vitra) Balcony approximately 3 m2 mosaic floor.
Hallway Bedroom
1 (Master Bedroom) Bedroom 2
Bedroom 3
Bathroom
Bathroom suite : Hand basin / Bath / Toilet unit (white)
Lighting. Ceramic Floor Tiles. (Vitra)
Ceramic wall tiles from floor to ceiling. (Vitra)
Guest Toilet Toilet unit and hand basin (white)
Ceramic Floor Tiles. (Vitra) Ceramic wall
tiles from floor to ceiling. Items included in this contract
Al plumbing included – piping / taps / water pumps etc. Solar panels
and hot water tank system. All internal walls to be painted in customers own
color choice. All doors internal and external to include locks, handles etc.
Sewage system – septic tank Building permissions, architect plans, and project
management fees. Items not included in this contract
Wooden or aluminum Shutters optional. Natural Marble Floors
Authority charges not included (electricity supply, water supply and telephone
line) Stamp Duty 6% not included. 5% VAT is not included.
Proposed payment schedule: 1. On signing contract date %20 (£10,
000) 2. Reinforced concrete structure & foundations date (£11,500
) 3. Brick work & plastering date (£11,500) 4. Ceramics, electrics,
windows, doors, and finishing date (£11,500) 5. Hand over date 10% (£5,000)
Total : 49.500 GBP Additional
Information: These apartments are located in the quite area of Upper
Kyrenia, a walking distance to Patara development and the nearest shops, supermarkets
and restaurants on the main road. The development is 15 minutes walk to Kyrenia
town centre. This development will differ from the existing ones in
style, comfort and affordable price. |
Click to enlarge 
More photos |